You Searched for: mumbai infrastructure
A recent study highlights a gradual reduction in slum-covered land in Mumbai’s peninsular region, dropping by 8.6% over 17 years. From 47.7 sq km in 2005, the slum area declined to 43.6 sq km in 2022, revealing a dynamic transformation in one of India’s most densely populated cities.
- 12th Nov 2024
- 1152 Views
Mumbai's ambitious coastal road project reached a milestone this week when the 44-meter length linking the northbound coastal road to the Worli sea connection was erected. This improves city connections, although project completion is projected to take place next year.
- 12th Nov 2024
- 1147 Views
As the last span of the northbound Mumbai Coastal Road is installed, it will connect smoothly to the Bandra-Worli Sea Link (BWSL). The 44-meter bridge span arrived in Worli on Monday from Karanja Port in Navi Mumbai, ready for deployment on Tuesday with a backup on Wednesday.
- 5th Nov 2024
- 1159 Views
In the next two years, House of Hiranandani, led by Surendra Hiranandani, would invest approximately ₹12,500 crore to increase its development footprint by 10 million square feet in the Mumbai Metropolitan Region (MMR). This strategic expansion will include acquisitions and greenfield ventures.
- 3rd Nov 2024
- 1156 Views
IAS officials, including Dharavi Redevelopment Project (DRP) CEO SVR Srinivas, Cidco president Vijay Singhal, and BMC associate municipal commissioner Abhijit Bangar, discussed city initiatives during the Maharashtra Infrastructure Conclave.
- 10th Oct 2024
- 1225 Views
Mega projects in Mumbai are improving commuting, decreasing pollution, and boosting economic development. Bridges, metros, and roads are changing how the city moves, linking critical neighbourhoods and enhancing quality of life.
- 9th Oct 2024
- 1167 Views
After 2.5 years of construction, the west-to-east Mith Chowky flyover in Malad will open to automobiles on Sunday, October 6, 2024. For cars driving from Marve and Malwani to Malad railway station, this partial opening might alleviate traffic at the bridge intersection.
- 6th Oct 2024
- 1200 Views
Mumbai's first underground metro line is open after delays and controversy. This Saturday, Prime Minister Narendra Modi will open the 12.5 kilometre Aarey-BKC metro line's first phase. The new metro line would cut travel time from Aarey to BKC to 22.30 minutes, down from an hour.
- 6th Oct 2024
- 1174 Views
The highly anticipated Mumbai Metro Aqua Line 3, also known as the Colaba-Bandra-SEEPZ Metro, is set to revolutionize intra-city connectivity. The Maharashtra Government has cleared all financial hurdles, ensuring the project moves forward with renewed momentum.
- 26th Sep 2024
- 1196 Views
In a significant push to ease traffic on Ghodbunder Road, a notorious bottleneck for motorists traveling from Mumbai, Thane, and beyond toward Nashik, Gujarat, and Konkan, the Mumbai Metropolitan Region Development Authority (MMRDA) has accelerated the development of alternative routes.
- 21st Sep 2024
- 1256 Views
A plan to construct a new expressway adjacent to the Mumbai-Pune Expressway is now underway. The first phase of this project will stretch from JNPA (Jawaharlal Nehru Port Authority) to Chowk (Karjat). The highway will later extend from Chowk towards Pune and eventually reach Bengaluru.
- 20th Sep 2024
- 1214 Views
Mumbai will build a modern inter-state parking hub on the Dahisar toll naka site. The Municipal Corporation of Greater Mumbai (MCGM) hopes to reduce traffic in Mumbai by providing parking for drivers from outside the city.
- 19th Sep 2024
- 1181 Views
The House of Hiranandani has signed agreements to redevelop five housing societies in Mumbai's Chembur suburb, a significant step towards urban renewal. These redevelopment projects, which encompass approximately 15 acres, offer a development potential of over 1.7 million square feet.
- 15th Sep 2024
- 1208 Views
Five ring roads are being built as part of a megacity inter-linking project to improve traffic flow and connectivity. The proposed Orange Gate tunnel will link the Freeway and Coastal Road at Marine Drive on the southernmost ring road. Mumbai will connect to Thane, Palghar, and Alibaug.
- 15th Sep 2024
- 1184 Views
The Madh-Versova cable-stayed bridge, worth 3,246 crore rupees, would lessen travel lengths by 3–4 km and boost communication between Versova and Madh. The bridge will be open 24 hours a day. Constructed in around 36 months, this 2.06 km bridge will boost infrastructure & Madh property prices.
- 11th Sep 2024
- 1223 Views